Abu Dhabi's 1 GW AI Campus Needs More Power Than the Country Forecast
The first 200 MW of Stargate UAE are supposed to be live this year. The site sits inside a 26 square kilometre campus in Abu Dhabi, built by G42 through its subsidiary Khazna, operated with OpenAI and Oracle, and fitted with roughly 100,000 Nvidia Grace Blackwell GB300 chips. The partners put the investment at up to $10 billion for a 1 GW cluster.