ACME Solar Secures 150 MW Hybrid Power Project PPA From NTPC Across Rajasthan, Gujarat And Madhya Pradesh
India’s power sector is moving beyond plain solar plants. Utilities now want clean energy that can be dispatched when demand peaks, which is why hybrid projects backed by storage are getting so much attention.
The Nifty 50 was trading at 25,236.25, down 0.60%. Meanwhile, the Sensex also fell 0.58% to 82,050.44 on Wednesday. Meanwhile, shares of ACME Solar Holdings Ltd. were trading at Rs. 411.60, up 2.05% from the previous close of Rs. 403.35. The stock opened at Rs. 404.00 and reached an intraday high of Rs. 416.25 and a low of Rs. 404.00. The company currently has a market capitalization of Rs. 29,094.95 crore.
Also Read: Sensex & Nifty 50 | Stock Market Live Updates Today: Sensex Falls 0.20%, Nifty Slips 0.23% as Banking, IT and Metal Stocks Decline
What’s the News
ACME Solar Holdings, through its subsidiary ACME Alpha Renewables, has signed a Power Purchase Agreement with NTPC for a 150 MW hybrid project under NTPC’s Hybrid-IV tranche. The tariff is Rs. 3.21 per unit and has already been adopted by the Central Electricity Regulatory Commission.
The project spans Bhadla in Rajasthan, Jambkhabalia in Gujarat and Mandsaur in Madhya Pradesh, combining solar, wind and energy storage. Supply is scheduled to begin on June 30, 2028, with a 25-year tenure from that date.
Financial Analysis
Looking at the quarterly results of ACME Solar, the company’s consolidated revenue from operations increased by 89.6% YoY, from Rs. 467.75 crore in Q2 FY26 to Rs. 887.01 crore in Q2 FY27, and increased by 3.4% QoQ from Rs. 857.50 crore in Q1 FY27.
In Q2 FY27, ACME Solar’s consolidated net profit increased by 133.5% YoY, reaching Rs. 268.66 crore compared to Rs. 115.07 crore during the same period last year. As compared to Q1 FY27, the net profit increased by 14.2% QoQ, from Rs. 235.33 crore. The basic earnings per share stood at Rs. 4.00 as against Rs. 1.90 recorded in the same quarter in the previous year, FY2026.
ACME Solar already earns from a mix of solar, battery storage, FDRE, hybrid and wind projects. This deal tilts the mix further toward firm, dispatchable power, which is easier to sell and less exposed to daytime-only generation. The order book is largely locked in: the under-construction PPA-backed portfolio now stands at 5,080 MW out of 5,380 MW. With a creditworthy buyer like NTPC and an in-house EPC arm, execution should be smoother and earnings more predictable over the long run.
Industry Context
India has set a target of 500 GW of non-fossil capacity by 2030, and non-fossil sources crossed half of the country’s installed capacity in 2025, well ahead of schedule. That shift is pushing developers to build bigger and smarter projects.
Peak power demand touched about 250 GW in 2024, and evening peaks remain the toughest to serve. Solar-wind-storage hybrids are built for exactly this gap, so tenders like NTPC’s Hybrid-IV tranche are likely to keep coming.
Company Overview
ACME Solar Holdings is an integrated renewable energy player with a contracted portfolio of 8,370 MW across solar, BESS, FDRE, hybrid and wind. It has an operational capacity of about 3,190 MW and 5.90 GWh of BESS capacity. Its in-house EPC and O&M teams handle projects end to end.
Also Read: Copper Prices Crash: Why KEI, Polycab & RR Kabel Could Face Inventory Losses