Ellomay Announces Receipt of a 22.2 MW / 100.3 MWh (4.5-hour) Battery Storage Grid Access and Connection Permit by Ellomay Solar
Tel-Aviv, Israel, Sept. 29, 2026 (GLOBE NEWSWIRE) -- Ellomay Capital Ltd. (NYSE American; TASE: ELLO) (“Ellomay” or the “Company”) , a renewable energy and power generator and developer of renewable energy and power projects in Europe, USA and Israel, announced today that its Spanish indirectly held wholly-owned subsidiary, Ellomay Solar S.L., which owns a 28 MWp solar facility in Talaván, Cáceres, Spain, received a battery storage grid access and connection permit for a project with a capacity for up to 22.2 MW /100.3 MWh (4.5-hour) (the “ BESS Facility ”). The BESS Facility also received a permit to charge 22.2 MW electricity from the grid. The charging permit is expected to increase the flexibility and profitability of the project.