chartexchange

LIFT Announces Results from Summer Drilling at the Adina Lithium Project, Québec

GlobeNewswire Inc. | Nov 17, 2026 3:05 AM EST

VANCOUVER, British Columbia, Nov. 17, 2026 (GLOBE NEWSWIRE) -- Li-FT Power Ltd. (“ LIFT ” or the “ Company ”) ( TSXV: LIFT ) ( ASX: LFT ) ( OTCQX: LIFFF ) ( Frankfurt:   WS0 ) is pleased to report results from 11 drill holes completed at the Adina Lithium Project (“Adina” or the “Project”) in Québec, Canada ( Figures 1, 2 ). These holes form part of LIFT’s 2026 work program, which comprised 39 holes totalling 11,420.5 metres, and follow the assay results from the first five holes announced October 26, 2026. LIFT also completed sampling of six geotechnical holes drilled in 2024, totalling 1,983 metres, that were previously unassayed for lithium. Accordingly, the cumulative 2026 drill core processed by LIFT comprises 45 holes and 13,403.5 metres.

Read original article