Delta Lithium Estimates $748m Net Present Value in Mt Ida Scoping Study
Delta Lithium’s Mt Ida scoping study points to a $748m post-tax NPV and 33% IRR, with an 11-year mine plan and $483m pre-production capex.
Delta Lithium’s Mt Ida scoping study points to a $748m post-tax NPV and 33% IRR, with an 11-year mine plan and $483m pre-production capex.