Atico Continues to Extend the Ore Body at El Roble Mine in Colombia and Reports Multiple Higher-Grade Intercepts up to 18.6m of 7.65% Cu, 2.22 g/t Au, 9.0m of 8.44% Cu, 3.58 g/t Au and 5.7m of 8.48% Cu, 7.41 g/t Au
VANCOUVER, British Columbia, Oct. 28, 2026 (GLOBE NEWSWIRE) -- Atico Mining Corporation (TSX.V: ATY | OTCID: ATCMF) (“Atico” or the “Company”) is pleased to announce positive results from 32 drill holes completed in 2026 within an area of historical mining, successfully expanding the tonnage at the El Roble mine. The table below highlights some assay results in bold for drill core holes, which include 18.6m of 7.65% Cu, 2.22 g/t Au, 9.0m of 8.44% Cu, 3.58 g/t Au and 5.7m of 8.48% Cu, 7.41 g/t Au. Ore grade intercepts are reported over widths of 0.25 to 18.6 meters in areas with limited drilling with results highlighting the possibility of further extending the ore body with additional drill programs.