Brixton Metals Drills 4 m of 1,975 g/t Silver within 23.50 m of 348 g/t Silver in Hole 449 at its Langis Project in Ontario
And 6.45 m of 667 g/t Silver, Including 3.19 m of 1,339 g/t Silver In Hole 412 And 9.00 m of 222 g/t Silver, Including 0.50 m of 1,605 g/t Silver In Hole 442 VANCOUVER, British Columbia, Oct. 06, 2026 (GLOBE NEWSWIRE) — Brixton Metals Corporation (TSX-V: BBB, OTCQX: BBBXF) (the “Company” or “Brixton”) is […]