Create Account
Log In
Dark
chart
exchange
Premium
Terminal
Screener
Stocks
Crypto
Forex
Trends
Depth
Close
Check out our Dark Pool Levels


Nickel production at Harjavalta stopped due to slag explosion


PR Newswire | Dec 27, 2021 02:21AM EST

12/27 01:20 CST

Nickel production at Harjavalta stopped due to slag explosion BOLIDEN, Sweden, Dec. 27, 2021

BOLIDEN, Sweden, Dec. 27, 2021 /PRNewswire/ -- Nickel production at the Harjavalta smelter has been stopped due to a slag explosion that was the result of a process malfunction in the nickel electric furnace slag tapping system on December 24.

No one was injured as a result of the explosion. The main damage is in the mechanical construction and the slag tapping system. Production in the nickel line has been stopped and is estimated to be offline until mid January.

Current estimates on the impact on EBIT due to the lost production and repair costs, is 100 MSEK, of which half in Q4 2021.

For further information, please contact:Hkan Gabrielsson, CFO, phone: ++46 70 844 0918Mail: hakan.gabrielsson@boliden.com

This information was brought to you by Cision http://news.cision.com

https://news.cision.com/boliden/r/nickel-production-at-harjavalta-stopped-due-to-slag-explosion,c3478614

The following files are available for download:

https://mb.cision.com/Main/997/3478614/ Press release Harjavalta Ni line slag1514814.pdf explosion

View original content: https://www.prnewswire.com/news-releases/nickel-production-at-harjavalta-stopped-due-to-slag-explosion-301450839.html

SOURCE Boliden






Share
About
Pricing
Policies
Markets
API
Info
tz UTC-4
Connect with us
ChartExchange Email
ChartExchange on Discord
ChartExchange on X
ChartExchange on Reddit
ChartExchange on GitHub
ChartExchange on YouTube
© 2020 - 2026 ChartExchange LLC