Purepoint Intersects 7.4 Metres Averaging 8,760 CPS at the Unconformity in First Drill Hole at Q24, Dorado Project
Toronto, Ontario--(Newsfile Corp. - September 17, 2026) - Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) ("Purepoint") today reported radiometric results from the completed 2026 summer drill program at the 50/50 Dorado Joint Venture ("Dorado" or the "Project") with IsoEnergy Ltd. (NYSE American: ISOU) (TSX: ISO), located in Saskatchewan's Athabasca Basin. Drill hole PG26-11, the first hole completed at the Q24 target, intersected 7.4 metres averaging 8,760 counts per second ("cps")...